Quality Control
QA/QC Introduction
We have a supervisor & 13 QCs in the factory. The QC uses AQL 2.5/4.0 for the production and issue a daily report to the supervisor. The supervisor reviews the reports and issues a general report to the factory director. The QC does not stay in the same production line for a long time, he will move to another production line each 3 months. The goods are 100% by the IQC in each production team.
Test Equipment and Facilities
Didn't find what you're looking for? Post a buying lead.
Contact Us
Miracle Group Ltd.
[Hong Kong]
Street Address : 8/F, Toi Shan Assn. Bldg, Nos. 167-169 Hennessy Road
Country/Region : Hong Kong